LT back online
1000 GMT 10th October 2005Following three weeks of engineering work where, amongst other things, the primary mirror was recoated, the cassegrain axis rotator was overhauled and the optics recollimated, the LT is now back online. Further details can be found on the Night Reports page. Some observations were made in the past week during recommissioning, which have been passed to their respective PIs, but regular observations will now resume as soon as weather permits.